Installation of new drainage channel and polyurethane screed.

Our clients existing drainage channel and polyurethane screed, was showing signs of age and been damaged over the years. They decided it was time to remove the old and replace with new .

First job was  to build a protective screen to close the area off so that their production was able to continue.

We then removed the old screed back to the concrete sub-floor and removed the broken drainage channel.



Once the old screed and channel had been removed we then installed a new channel and built up the sub-screed with fall towards the new channel.




 
Finally we installed the new polyurethane screed and cove including new stainless steel trim to top of the cove.
 


 
 
The Finished Area.
 
 
 
 
To find a full range of our products and services please visit our website on the following link:
 
 
or contact us on the following email:
 


Copyright Floor Painters Limited 2016. All Rights Reserved.
 



Epoxy coating to maintance workshop

Our client asked us to install a solvent free high build epoxy coating to their maintenance area.
The current floor was a polished concrete slab.
To start we prepared the concrete slab by diamond grinding to achieve the required surface key and to remove any contaminants.
A base cost of solvent free high build epoxy was then applied.
After the base coat has cured a further two top coats of solvent free high build epoxy coating where applied.

Preparation in progress.

Completed preparation

The final top coat


To discuss how we can assist with your flooring project please contact us on the following email: darren@floorpainters.co.uk

Copyright Floor Painters Ltd 2016


Thursday, 17 March 2016

Coldstore floor repairs

Cold store floor repairs at -22 C

Our client required repairs to be carried out in their cold store with minimum disruption to their operation.
The work required was to repair 10 failed joints in the concrete slab.
We had to cut out the failed joints and damaged edges and apply a freezer grade mma primer and flexible mma deckcoat filler . Each joint was repaired individually taking 2 hours 30 minutes from start to complete curing proceeds.
Website: www.floorpainters.co.I'm
Email: darren@floorpainters.co.I'm


Copyright Floor Painters Ltd 2016 all rights reserved 
 Preparation the key to a successful application


 Removing old coatings using grinding machines or enclosed shot blasting









Factory Unit Refurbishment








Preparation and Installation of High Build Solvent Free Epoxy Coating


In this unit we found an old painted floor , damaged floor joints and uneven areas  



Enclosed Shot Blasting

We decided to use a ride on enclosed shot blaster to remove all existing

coating and provide us with a clean surface for the new floor paint.


 
 


Using steel shot propelled at high force against the concrete

this ride on shot blaster removed the old coating easily and quickly.


The blasting action is contained within the front of the machine

whilst the dust created is collected into the back of the vehicle.


The difference between old and new can been seen clearly
 




Some areas had to be prepared using our grinding machines to remove glue .

Polyurethane Floor Repairs to Food Factory

Polyurethane Floor Repairs to Food Factory.
 
Our client required us to carry out repairs to their food factory floor during a planned shut down period.

 

The repairs required were:

  1. -To remove failed areas of Screed and replace with new.
  2. -To cut through cracks in the floor and fill with polyurethane expansion material .
  3. -To repair a collapsed drainage channel.
  4. -Installation of Polyurethane coving.
  5. -Polyurethane coating to existing coving.

 


Screed Repairs


Damaged area of screed was cut square and removed.
The sub-screed was repaired