Factory Walkways and crossings.
Our client required walkways and pedestrian crossings installing to the new factory. The current floor was a polished concrete surface. Before we could install any epoxy resin we needed to prepare the surface. This time we used enclosed shot blasting to remove the surface layer to achieve the required surface key.
Shot Blasting in progress. |
A Single coat of Epoxy Primer was then applied.
Clear Epoxy Primer. |
Once the primer had cured a top coat of Solvent Free high Build Epoxy Coating with a texture additive was applied. The Texture additive will help to achieve a slip resistant surface.
No comments: