Warehouse loading dock improvements - 3 doorways
We were asked by one of our clients to install 3 slip resistant areas around their loading docks.
Stage 1 Firstly we had to remove the old coating around the doorways which had worn out. This was done with diamond floor grinders which removed the old coating and produced the required keyed surface for the new system.
Before
|
After preparation
|
Stage 2
Once the preparation was complete a primer coat of solvent free epoxy coating was applied to which a full broadcast of aggregate was applied.
Primer coat
|
Full aggregate broadcast
|
Stage 3
A final top coat of solvent free epoxy coating was applied to seal the aggregate and achieve the slip resistant loading pads.
Finished loading pad
|
To find a full range of our products and services please visit our website on the following link:
or contact us on the following email:
No comments:
Post a Comment