Friday, 4 October 2019

Industrial Floor Refurbishment Using Polymer Modified Pump Screed

After years of heavy use this old foundry floor needed refurbishment ,



We removed the existing old floor using industrial road planers to a depth of 15mm

 I thought this was big but I was told they come a lot bigger

Removing waste on this quantity requires road sweepers .


The waste was put into large tipper lorries and removed from site