Our clients existing drainage channel and polyurethane screed, was showing signs of age and been damaged over the years. They decided it was time to remove the old and replace with new .

First job was  to build a protective screen to close the area off so that their production was able to continue.

We then removed the old screed back to the concrete sub-floor and removed the broken drainage channel.



Once the old screed and channel had been removed we then installed a new channel and built up the sub-screed with fall towards the new channel.




 
Finally we installed the new polyurethane screed and cove including new stainless steel trim to top of the cove.
 


 
 
The Finished Area.
 
 
 
 