Sunday 27 September 2015

Warehouse loading dock improvements

 

Warehouse loading dock improvements - 3 doorways

We were asked by one of our clients to install 3 slip resistant areas around their loading docks.
 
Stage 1 Firstly we had to remove the old coating around the doorways which had worn out. This was done with diamond floor grinders which removed the old coating and produced the required keyed surface for the new system.
Before
After preparation


 

Stage 2      
 
Once the preparation was complete a primer coat of solvent free epoxy coating was applied to which a full broadcast of aggregate was applied.
Primer coat
Full aggregate broadcast


 
 
 Stage 3
 
A final top coat of solvent free epoxy coating was applied to seal the aggregate and achieve the slip resistant loading pads.
 
Finished loading pad
 

To find a full range of our products and services please visit our website on the following link:
 
 
or contact us on the following email:
 

No comments:

Post a Comment